Search results 0-1 Location of Site Compound and Offices Setting up on Site 0.1 Location of Site Compound and Offices The actual location of the compound and offices may be restricted to a fixed pre-determined position. It may, however, be the Contractor’s responsibility to find an area for the site offices... 0-1-location-of-site-compound-and-offices The Dangerous Substances and Explosive Atmospheres Synopsis of other Legislation The Dangerous Substances and Explosive Atmospheres Regulations 2002 The Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR) require employers to control the risks to people's safety from fires, explosions... B7-the-dangerous-substances-and-explosive-atmosphe Description of dangerous substances Dangerous substances Introduction Description of dangerous substances The HSE define dangerous substances as any substances or preparation used or present at work that could, if not properly controlled, cause harm to people as a result of a fire or explosion... E4-description-of-dangerous-substances Introduction Demolition Demolition techniques Piecemeal demolition - by machine Introduction Roof structures supported on wall plates should normally be demolished to wall plate level by hand. Where the building to be demolished is attached to another structure, the... E6-techniques-introduction Services Exclusion zones Overhead and Underground Services Underground services Services Exclusion zones For underground services, the exclusion zone is defined as the horizontal distance from either side of the outside dimensions of any buried service and extends to the surface with... e18-services-exclusion-zones Definition Of Falsework Temporary Works & Falseworks Definition The BS 5975:2024 definition description of temporary works is: “An “engineered solution” that is used to support or protect either an existing structure or the permanent works during construction,... E19-definition-of-falsework Appendix 1 - Build UK Induction Standard Training Appendix 1 - Build UK Site Specific Health and Safety Inductions Background Site inductions are delivered across the UK every day with the objective of briefing the workforce on the health, safety and environmental aspects of the construction project... A3-appendix-1-build-uk-induction-standard Primary Legislation (Acts etc.) Register of Legislation 13 WATER AND WASTE WATER LEGISLATION Acts - Primary Legislation Legislation Title England Wales Scotland Summary of requirements relevant to construction and the environment Control of Pollution Act 1974 ✓ Sections... 03-13-primary-legislation-acts-etc Secondary Legislation (Statutory Instruments - Reg Register of Legislation 13 WATER AND WASTE WATER LEGISLATION Statutory Instruments Regulations, Orders - Secondary legislation Legislation Title England Wales Scotland Summary of requirements relevant to construction and the environment The Trade... 03-13-secondary-legislation-statutory-instruments- 7.8.5 Planning the construction works ECOLOGY 7.8 FISH 7.8.5 Planning the construction works Before any construction works in, on, under or over a main river are commenced in England or Wales the EA or NRW should be consulted as these works could require an Environmental Permit (see 13.5.1). Construction... 07-8-5-planning-the-construction-works 15 16 17 18 19 20 21 22 23 24