Search results Material Storage Erection of Structures Site Conditions Material storage Appropriate areas should be allocated by the principal contractor for stacking and storing components and should be clearly marked on site plans. These areas should be: Clear of obstruction,... E16-material-storage Training And Supervision Erection of Structures Training and supervision An overall training programme should be planned for each and every erector, with progress through the training period being recorded by the employer in a registration book, and they should hold a nationally... E16-training-and-supervision Steel Erection Erection of Structures Method Statement Checklists Checklist for steel erection method statement Steel erection method statements should normally include the following so far as is relevant in the circumstances:- Name(s) and address(es) of the contractors... E16-steel-erection Precast Concrete Erection Erection of Structures Method Statement Checklists Checklist for method statements for placing/erection of precast concrete Method statements for placing/erection of precast concrete should normally include the following so far as relevant in the circumstances:- Name... E16-precast-concrete-erection Timber Frame Erection Erection of Structures Method Statement Checklists Checklist for timber frame erection method statements Method statements for timber frame erection should normally include the following so far as is relevant in the circumstances Name and address of the contractor... E16-timber-frame-erection Loading And Storage Areas Mobile Plant and Site Transport Safe Workplaces Loading and storage areas The planning and design of loading and storage areas requires careful assessment of material delivery programming, quantities, bulk and protection from the weather, both in the short term... D5-loading-and-storage-areas References Mobile Plant and Site Transport References Legislation Health and Safety at Work etc. Act 1974. Management of Health & Safety at Work Regulations 1999. Construction (Design & Management) Regulations 2015 The Work at Height Regulations 2005 Provision... D5-references Checklist 6 Temporary Works and Falsework Safety Check List 6 Concreting operations General Prior to concreting, the following precautions should be taken when blowing out the forms: Safe access must be provided. The risk of using lances or other vibratory equipment... E19-checklist-6 Sources Of Information The Control of Hazardous Substances Sources of Information on substances hazardous to health Information about the hazardous properties of substances can be found in many places and include: information on labels and manufacturer’s safety data sheets... C2-sources-of-information Timber Treatment Refurbishment Hazards to Health Timber treatment When timber has been attacked by insects, the treatment is to spray the timber with a material which kills any insects which happen to be present and also leaves behind a residue which is toxic, so that further... E21-timber-treatment 10 11 12 13 14 15 16 17 18 19