Search results First Aid Rooms Site Logistics and Planning First aid First aid rooms The provision of a first aid room should be considered where there is a high risk from hazards, or the workplace is remote from accident and emergency facilities. These criteria may apply on some large construction... a2-first-aid-rooms Pre-contract Appraisal Site Logistics and Planning Pre-contract appraisal and determining requirements Prior to work starting on site, the pre-construction information should be closely studied by the Principal Contractor and the following steps taken, ensuring that, where appropriate,... a2-pre-contract-appraisal Control Respirable Crystalline Silica Control The 2020 workplace exposure limit in the UK is 0.1mg/m3 per 8 hour working day. However there is growing evidence that this exposure level is not safe, and therefore more needs to be done to control the risks. There... c6-control Lithium Ion Batteries on site Electricity Lithium Ion Batteries on site Introduction Lithium-ion batteries are small and lightweight but are capable of storing a large amount of energy. As a result of these characteristics, they are volatile under stress, therefore, if damaged or incorrectly... e13-lithium-ion-batteries-on-site Survey, Location and Identification Overhead and Underground Services Underground services Survey, Location and Identification Before any excavation or breaking ground is carried out, the work area must be scanned by the Utility Coordinator to check for buried services. Trial holes must be excavated... E18-survey-location-and-identification Energy Checklist Energy, Climate Change and Greenhouse Gas Mitigation Checklist - Planning YES NO N/A Comments / Actions Planning - General Have energy objectives and targets (e.g.for electricity and fuel use) been set for this project? Has... 12-energy-checklist High-Rise construction FIRE Fire Risk Assessment High-Rise construction A high-rise construction site has traditionally been where the workforce is at increased risk due to the height of the building under construction - nominally >18m. These Projects will typically have project-specific... e3-high-rise-construction Introduction ECOLOGY 7.17 INVASIVE PLANT SPECIES Introduction Invasive plants are those, generally non-native to the UK and introduced deliberately or accidentally, which can rapidly spread and take over areas to the detriment of other existing plant and animal species and... 07-17--introduction 5.4 Example questions - prequalification PROCUREMENT OF SUBCONTRACTORS, DESIGNERS AND SUPPLIERS 5.4 Prequalification or Tender Questionnaires 5.4.1 Standards CAS and PAS91 The Common Assessment Standard (CAS) developed by Build UK, is a comprehensive industry-agreed questionnaire based on existing... 05-4-example-questions-to-include-in-prequalificat 0-1 Location of Site Compound and Offices Setting up on Site 0.1 Location of Site Compound and Offices The actual location of the compound and offices may be restricted to a fixed pre-determined position. It may, however, be the Contractor’s responsibility to find an area for the site offices... 0-1-location-of-site-compound-and-offices 15 16 17 18 19 20 21 22 23 24